November 2011: Booster Pumps Will Facilitate the Flow of Dredge Material in the Pipeline |
|

November 2011: The Double-Walled Pipeline Along Route I-690 |
|

October 2011: The Pipeline Crosses Underneath Various Roadways Along its Path |
|

October 2011: Workers Build a Booster Pump Station near Onondaga Lake |
|

October 2011: A Pad is Prepared for Installation of One of Four Booster Pumps Along the Pipeline Route |
|

June 2011: Sections of Pipe are Lowered into Place as Construction of the Pipeline Begins |
|

June 2011: Sections of Double-Walled Pipe are Aligned for Welding |
|

June 2011: Sections of Pipe are Welded Together in the Field to Form the Approximate Four-Mile-Long Pipeline |
|

June 2011: Early Pipeline Sections Begin to Form the System that Will Transport Dredge Material to the Processing Area |
|

May 2011: Sections of Double-Walled Pipe Assembled by Vari-Tech LLC in Liverpool, NY, are Stacked for Delivery |
|

May 2011: Worker Examines Sections of the Double-Walled Pipe Before Delivery |
|

May 2011: Vari-Tech Employee Welds the Double-Walled Pipe |
|
|