Consolidation Area Water Treatment Plant
Aerials
Lakeshore Activities
FMA Live!
Barrier Wall Construction
Pipeline Progress
Consolidation Area
Sportsmen's Day
Honeywell Institute of Ecosystems Education
Honeywell Summer Science Week at the MOST
Shrub Willows
LCP Wetland Restoration
Willis Avenue Groundwater Treatment System
Solvay-Geddes Community Center
Reed Webster Park
Discovery Day at the MOST
Nine Mile Creek
Onondaga Lake Data Collection
Former LCP Site
Barrier Wall Construction
Phase Three of Underground Barrier Wall Construction
October 2011: Workers Check Alignment of the Panels
October 2011: Vibratory Hammer Drives Steel Panels into the Ground
October 2011: Worker During Barrier Wall Construction Uses a Torch
October 2011: Workers Continue Installing Phase III of the Barrier Wall
October 2011: Workers Check the Steel
September 2011: Steel is Hoisted into Place
September 2011: Workers Check the Steel Before it is Driven into the Ground
September 2011: Phase III of the Barrier Wall Continues Near Harbor Brook
September 2011: The Vibratory Hammer Being Positioned
September 2011: Barrier Wall Phase III Panels Being Driven into the Ground
September 2011: Worker Uses a Torch on the Steel
September 2011: Phase III of the Barrier Wall in Vicinity of Harbor Brook
May 2011: Steel Panels are Ready for Phase III of the Barrier Wall
May 2011: The Interlocking Steel Pieces are Coated with Sealant
May 2011: Worker at JPW Riggers Where Panels Were Assembled
May 2011: Each Steel Panel is Tested to Ensure Superior Quality
May 2011: The First Steel Arrives to the Shoreline to Begin Phase III of the Barrier Wall
May 2011: Steel Panels are Stacked on Site Before Use
Phase Two of Underground Barrier Wall Construction
July 2010: A Steel Panel is Lowered into Place as Work Continues on Phase II of the Barrier Wall
July 2010: A Steel Panel is Ready to be Lifted into Place
October 2009: Workers Move Gravel Behind the Barrier Wall
October 2009: Barrier Wall Steel Panels Driven into the Ground to Stop Groundwater from Reaching the Lake
October 2009: Worker Compacts the Shoreline Along Phase II of the Barrier Wall
October 2009: Grading Work Continues Along the Shoreline Next to Phase II of the Barrier Wall
August 2008:
When Complete, the Second Phase of the Barrier Wall Will Span 1,650 Feet
August 2008:
Workers Monitor Installation Process
August 2008:
A Technician Controls the Vibratory Hammer from an Excavator
August 2008:
Worker Inspects Steel Panel
August 2008:
Worker Signals to Vibratory Hammer Technician
August 2008:
Worker Helps Guide Panel into Place
August 2008:
Each Panel is Two Feet Wide, Weighing One-and-One-Half Tons
August 2008:
Worker Attaches Vibratory Hammer to Panel
August 2008:
Workers Discuss Next Steps
August 2008:
Worker Completes Progress Check
August 2008:
Worker Welds Panels Together
August 2008:
Welding Panels Together Prevents Panels from Shifting
August 2008:
The Hammer Creates a Vibration, Allowing the Panels to Slide into Place
August 2008:
Worker Checks Installation Progress
August 2008:
A Worker Directs the Vibratory Hammer with a Remote Control
August 2008:
The Consistency and Height of Each Steel Panel is Checked as the Wall Expands
August 2008:
A Handheld Remote Unit Controls the Vibratory Hammer
December 2007:
Lakeshore Along
I-690
December 2007:
Workmen Move Steel Panel
December 2007:
Workmen Inspect Machinery
December 2007:
Workman Attaches Cable to Wall Section
December 2007:
Steel Panel Moved into Location
December 2007:
Wall Section Guided into Place
December 2007:
Ice Removal
December 2007:
Steel Panel Awaits Vibratory Hammer
December 2007:
Technician Inspects Vibratory Hammer
December 2007:
Vibratory Hammer Attached to Machinery
December 2007:
Workman Operates Machinery
December 2007:
Workman Lifts Vibratory Hammer
December 2007:
Cables Help Guide Vibratory Hammer
December 2007:
Vibratory Hammer Attaches to Steel Panel
December 2007:
Vibratory Hammer Atop Steel Panel
December 2007:
Workman Moves Cables
December 2007:
Vibratory Hammer Begins its Work
December 2007:
Vibratory Hammer is Controlled by Remote
December 2007:
Hammer Drives Steel Panel into Place
December 2007:
Steel Panel is Driven to Desired Depth
Phase One of Underground Barrier Wall Construction
October 2006:
Barrier Wall Steel Panels
October 2006:
Steel Panel Sealant
October 2006:
Steel Panel Rigging
October 2006:
Barrier Wall Installation
October 2006:
Barrier Wall Installation
October 2006:
Barrier Wall Installation
October 2006:
Barrier Wall Installation
October 2006:
Barrier Wall Installation
October 2006:
Barrier Wall Installation
October 2006:
Barrier Wall Installation
October 2006:
Barrier Wall Installation
October 2006:
Barrier Wall Installation
October 2006:
Barrier Wall Installation
October 2006:
Barrier Wall Installation
October 2006:
Barrier Wall Installation